Mining
Injection chemicals and foams are designed provide reliable reinforcement, sealing, and stabilization in underground mining environments. The chemicals and foams improve safety and structural integrity even in challenging ground conditions.
Product type
3 results
-
Urea-Silicate
DSI Mineral Fill
- Appearance
- Component A: colourless liquid / Component B: dark brown liquid
- Foam factor
- at 25˚ C with 40±10
- Reaction start time
- at 25˚ C in 10 - 20 seconds
-
Urea-Silicate
DSI Mineral Bolt
- Appearance
- Component A: pale yellow liquid / Component B: dark brown liquid
- Foam factor
- at 25˚C with 1.0
- Reaction start time
- Medium version in ~ 105 seconds
-
Urea-Silicate
DSI Mineral Bond
- Appearance
- Component A: colourless liquid / Component B: dark brown liquid
- Foam factor
- at 25˚C with 1.0
- Reaction start time
- at 25˚ C in 30 - 60 seconds